92 entries | Generated 2026-06-25 08:07 | Source: LNM01252026.pdf

Category Item Description
General Ambrose Channel – Boat Parade Ambrose Channel – Main Channel/General/Marine Events/Boat Parade | Marine Events | General/Marine Events/Boat Parade From: 2026-07-03 To: 2026-07-05 NEW YORK, NY – HUDSON RIVER – UPPER BAY – LOWER BAY – SAIL 4TH 250 – SPECTATOR AREAS Mariners are advised that the Captain of the Port Sector New York will be enforcing 9 Spectator Areas in the Upper Bay and Lower Bay of New York Harbor from 3 p.m. on July 3rd, 2026 until 8 a.m. on July 5, 2026. Additionally, the Coast Guard will be enforcing 4 Paddle Craft Spectator Areas Hudson River from 6 a.m. on July 4, 2026, until the conclusion of the Tall Ship Parade. All spectator areas are designated for vessels observing the International Naval Review, International Aerial Review, and Tall Ship Parade of Sail and will be available on a first-come, first-served basis. Listed below are the 9 spectator areas and regulations pertaining to them: 1. Spectator Area 1: Exclusive use for vessels certificated under 46 CFR Subchapter T or Subchapter K spectator vessels. 2. Spectator Area 2: Exclusive use for spectator vessels less than 82 feet (25 meters) in length. 3. Spectator Area 3: Exclusive use for spectator vessels less than 82 feet (25 meters) in length. 4. Spectator Area 4: Exclusive use for spectator vessels between 82 feet (25 meters) and 197 feet (60 meters). 5. Spectator Area 5: Exclusive use for spectator vessels less than 82 feet (25 meters) in length. 6. Spectator Area 6: Exclusive use for spectator vessels between 82 feet (25 meters) and 197 feet (60 meters). 7. Spectator Area 7: Exclusive use for spectator vessels greater than 197 feet (60 meters). 8. Spectator Area 8: Exclusive use for spectator vessels less than 197 feet (60 meters). 9. Spectator Area 9: Exclusive use for any spectator vessel on a first-come first-served basis. Exact coordinates for each spectator area can be found 33 CFR 100.T0199- 0903(b). All spectator vessels shall be in their designated spectator area no later than 6 a.m. on July 4, 2026, unless they have received permission from the Captain of the Port Sector New York to operate otherwise. Further information regarding spectator areas can be found in MSIB 26-007 “New York Sail 4th 250 / Multiple Fireworks Displays – Critical Safety & Transit Rules in the Port of New York on July 4, 2026”. This Marine Safety Information Bulletin can be found at Northeast Coast Guard District’s Local Notice to Mariners website https://www.navcen.uscg.gov/local-notices-to-mariners?district=1+0&subdistrict=n, under the Special Notices section.
Bridges Ambrose Channel – Main Channel/General/Bridges/Rehabilitation From April 1, 2026, through September 30, 2026, contractors will be installing main cable access platforms above the roadways of the Verrazzano Narrows Bridge, mile 0.0 across New York Harbor. The safety boat RHIANNON will be stationed below active work on this project during the hours of 7:00 a.m. and 3:30 p.m., as well from 10:00 p.m. to 6:00 a.m. The safety boat will move upon request by contacting the vessel directly on VHF-FM Channels 13 or 16. For more information regarding this project contact Eric Dovak at (347) 860-2399.
General Ambrose Channel – Main Channel/General/Marine Events/Other Ambrose Channel – Main Channel/General/Marine Events/Other | Marine Events | From: 2026-07-01 To: 2026-07-09 Location: NEW YORK, NY – HUDSON RIVER/UPPER BAY/LOWER BAY – SAIL 4TH 250 – TEMPORARY SUSPENSION OF ANCHORAGE GROUNDS Mariners are advised that several federal anchorage grounds (including Anchorage numbers 16, 17, 19-West, 20-A through 20-G, 21-B, 21-C, 23-A, 23-B, 24, 25, 49-F, and 49-G) are temporarily suspended from July 1, 2026, through July 9, 2026. Vessels wishing to anchor in a suspended ground may be able to do so if the anchorage is not being used by event participant or spectator vessels, and the Coast Guard gives authorization to anchor there. To request authorization, contact Vessel Traffic Service New York on VHF-FM Channel 12 or at (718) 354-4088.
Marine Events Ambrose Channel – Regatta General/Marine Events/Regatta (Race) From: On the following Saturdays, June 6, June 27, July 18, and August 22, 2026 (11:00am- 6:00pm) 2026-06-06 To: 2026-08-22) Location: NJ/NY – HUDSON RIVER – UPPER AND LOWER NEW YORK HARBOR – SAILING REGATTA Details: Mariners are advised that a sailing regatta race series is scheduled to be held on multiple Saturdays (June 6, June 27, July 18, and August 22, 2026) on the Hudson River and the Upper and Lower Bays of New York Harbor between Morris Canal and the West Bank Lighthouse. Races will occur between 11:00 a.m. and 6:00 p.m. and involve approximately 12 participating sailboats (26-45 feet in length) and additional motorized support vessels. Interested mariners may contact the Principal Race Officer on marine band radio channel 63A VHF-FM. BNM for June 27th Event (copy and paste into URL) https://www.navcen.uscg.gov/broadcast-notice-to-mariners-message?guid=68973801
Marine Events Ambrose Channel – Regatta General/Marine Events/Regatta (Race) From: 2026-04-29 To: 2026-10-18 New York, NY – UPPER BAY – Sailing Regatta Mariners are advised that a sailing regatta is scheduled to be held in the Upper Bay south of Governors Island, near Bay Ridge Flats, beginning April 29, 2026 through October 18, 2026, on every Wednesday and Thursday between the hours of 6:00 p.m. to 9:00 p.m., on Saturdays between the hours of 12:00 p.m. to 5:00 p.m., and on Sunday October 18, 2026 between the hours of 12:00 p.m. to 5:00 p.m. Approximately 13 sailboats, 24-26 feet in length, with multiple motorized support vessels will participate. Interested mariners may contact the Executive Director on marine band radio channel 71 VHF-FM. The race schedule between June 17, 2026 and July 11, 2026 maybe be impacted by other activities and marine events associated with Sail 4th 250 and International Naval Review 250.
Marine Events Ambrose Channel – Regatta General/Marine Events/Regatta (Race) From: Every Wednesday Night (6pm-8:45pm) beginning 2026-04-29 To: 2026-09-16. Note1: No races on Wednesday July, 1, 2026, this event in the weekly series moved to Tuesday, June 30, 2026 (6pm-8:45pm) Note2: No races on Wednesday July 8, 2026 Details: NY – UPPER NEW YORK HARBOR – Sailing Regatta Mariners are advised that a sailing regatta race series are scheduled to be held every Wednesday evening on the Upper New York Harbor between Morris Canal and Robbins Reef beginning April 29 through September 16, 2026. Races will occur between 6:00 p.m. and 8:45 p.m. Approximately 20 sailboats (28-50 feet in length) and additional motorized support vessels will participate in the regattas on consecutive Wednesdays, except for the 4th of July week when the races will be moved to Tuesday evening at the same scheduled time. Interested mariners may contact the Principal Race Officer on marine band radio channel 63 VHF-FM. Location: 40-42- 35.604N/074-01-52.212W 40-41-52.944N/074-01-15.744W 40-41-09.384N/074-01-37.380W 40-40-48.288N/074-01-42.312W 40- 40-21.576N/074-01-23.772W 40-39-27.216N/074-03-26.748W 40-39-57.672N/074-03-27.972W 40-40-42.888N/074-02-58.020W 40-41-03.516N/074-02-24.324W 40-42-35.604N/074-01-52.212W
Marine Events Ambrose Channel – Regatta General/Marine Events/Regatta (Race) From: 2026-05-26 To: 2026-10-14 Location: NY/NJ – UPPER BAY – Sailing Regatta Mariners are advised that a weekly reoccurring regatta is scheduled on the Upper Bay of New York Harbor, every Tuesday from May 26, 2026, until October 13, 2026, from 6:30 pm until 8:00 pm. Approximately 15 sailing vessels will maneuver on various courses on the Upper Bay, between Ellis Island and Governors Island. Interested mariners may contact the race coordinator on VHF-FM Channel 68 during the scheduled regattas for further information.
Marine Events Ambrose Channel – Regatta General/Marine Events/Regatta (Race) From: 2026-05-27 To: 2026-10-15 Location: NY/NJ – UPPER BAY – Sailing Regatta Details: Mariners are advised that a weekly reoccurring regatta is scheduled on the Upper Bay of New York Harbor, every Wednesday from May 27, 2026 until October 14, 2026, from 6:30 pm until 8:00 pm. Approximately 15 sailing vessels will maneuver on various courses on the Upper Bay, between Ellis Island and Governors Island. Interested mariners may contact the race coordinator on VHF-FM Channel 68 during the scheduled regattas for further information.
Bridges Ambrose Channel – Rockaway Inlet/General/Bridges/Closure (Scheduled Or Emergency) General/Bridges/Closure (Scheduled Or Emergency) From: 2026-06-19 To: 2026-12-20 Location: 40-34-22.000N/073-53-05.000W Bridge Name: Marine Pkwy Bridge NEW YORK – JAMAICA BAY – Emergency Closure – Due to mechanical issues affecting the span lock system at the Marine Parkway Bridge, mile 3 across Jamaica Bay, Brooklyn, NY, MTA is authorized closure of the drawbridge for emergency repair. Mariners that can transit without requesting an opening are advice to transit with caution.
Bridges Ambrose Channel – Rockaway Inlet/General/Bridges/Inspection General/Bridges/Inspection From: 2026-06-01 To: 2026-08-02 Location: 40-34-22.000N/073-53-05.000W Bridge Name: Marine Pkwy Bridge From June 1, 2026 – August 1, 2026, between 6:30 a.m. and 4:00 p.m., a diving inspection of the Marine Parkway Bridge over Jamaica Bay at mile 3.0 shall take place. Safety vessel NJ3293HB will be on scene during diving operations. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 201-803-7371. Mariners are advised to exercise caution when transiting the area.
Hazards To Navigation Approaches To New York Nantucket Shoals To Five Fathom Bank – Fire Island Inlet/General/Hazards To Navigation/Shoaling Reported General/Hazards To Navigation/Shoaling Reported From: 2024-09-12 To: 2039-11-14 Location: 40.63186° N / 73.3053° W 40.63094° N / 73.29678° W 40.62873° N / 73.29154° W 40.6278° N / 73.27761° W 40.62674° N / 73.27757° W 40.62762° N / 73.29276° W 40.62948° N / 73.29692° W 40.63016° N / 73.30538° W 40.62915° N / 73.3204° W 40.62306° N / 73.3237° W 40.62391° N / 73.33134° W 40.63165° N / 73.32152° W 40.63186° N / 73.3053° W NY-FIRE ISLAND INLET Shoaling has been identified in Fire Island Inlet in the area between buoys 3, 7, 13, and 15. Mariners are urged to use caution while transiting the area.
Marine Construction (Excluding Bridges) Beach Channel – North Channel/General/Marine Construction (Excluding Bridges)/Dredging General/Marine Construction (Excluding Bridges)/Dredging From: 2026-04-07 To: 2026-07-31 H & L Contracting LLC under contract to U.S. Army Corps of Engineers will be conducting dredging operations in Jamaica Bay, from May 15, 2026, to July 31, 2026, seven days a week, between 7:00am to 7:00pm. Equipment on scene will be 10” Hydraulic Dredge GREAT GUN, deck/spud barge 100’ x 40’ with excavator, various sand scows and tugboats, an unnamed work skiff, and dredge pipeline, monitoring VHF-FM CH 16 &65 and are requesting a 30-minute notice for vessel movement requests. There will be two moorings set in positions 40 38’ 16.87N, 073 51’ 52.87” W and 40 38’ 28.25N – 73 51’ 17.88W.
Bridges Block Island Sound And Gardiners Bay – Long Island Sound Eastern Part/General/Bridges/Rehabilitation General/Bridges/Rehabilitation From: 2025-04-16 To: 2026-12-01 Location: 41.176728° N / 73.176352° W Bridge Name: Stratford Ave Bridge CONNECTICUT – PEQUONNOCK RIVER – Bridge Rehab – From April 21, 2025 through November 30, 2026 contractors will be utilizing a under bridge work platform truck to access the Stratford Avenue Bridge across Pequonnock River at mile 0.1. This truck is required for rehabilitation of the bridge. The work platform will not be in the navigational channel. Questions may be directed to Superintendent Wesley Sousa Santos at (860) 622-8410. Mariners are advised to exercise caution when transiting the area.
Discrepancy East River Regulatory Light C Aid status: structure destroyed (STRUCT DEST); Light List number: 27246.2; Aid type: Private aid (PA)
Discrepancy East River Regulatory Light E Aid status: off station / hazard to navigation (OFF STA/HAZ NAV); Light List number: 27246.4; Aid type: Private aid (PA)
ATON Changes Fire Island Inlet – State Boat Channel/ATON/ATON Changes ATON/ATON Changes From: 2026-06-12 To: 2026-06-26 Location: 40-38-33.972N/073-14-50.460W Aid Name: State Boat Channel Buoy 84 LLNR: 31465 Action: RELOCATE Relocated FM: 40-38-33.987N / 073-14-50.453W Relocated TO: 40-38-34.493N/ 073-14- 50.367W
Discrepancy Fire Island Inlet Channel Lighted Buoy 7 Aid status: sinking (SINKING); Light List number: 29155; Aid type: Federal aid (FD)
Hazards To Navigation Gardiners Bay South Entrance – Shelter Island Sound South Channel/General/Hazards To Navigation/Obstructions General/Hazards To Navigation/Obstructions From: 2026-05-28 To: 2027-05-01 Location: 40-53-31.488N/072-17-10.608W Sound and the Sea, LLC will conduct scientific research focused on marine mammal detection and monitoring in the Atlantic Ocean south of Long Island, New York, off Mecox Bay. Four bottom-mounted passive acoustic monitoring devices will be deployed at specified coordinates: Sensor 1 (40°53’31.499″ N, 72°17’10.612″ W), Sensor 2 (40°52’33.985″ N, 72°18’8.856″ W), Sensor 3 (40°52’34.698″ N, 72°19’44.666″ W), and Sensor 4 (40°51’37.181″ N, 72°20’42.911″ W). Each device will be moored to the seafloor with a footprint of approximately one square foot and a line floating up to eight feet above the seafloor, at depths between 50 and 60 feet. The monitoring will be continuous, operating 24/7 from June 7, 2026, to May 1, 2027.
Hazards To Navigation General/Hazards To Navigation/Obstructions General/Hazards To Navigation/Obstructions From: 2026-03-13 To: 2026-09-09 Location: 41-02-54.996N/072-22-21.972W A sunken barge 70’x26’x5’ along with a 70 ton crane has been reported in position 41-02’-55” , 072-22’-22” in the vicinity of Paradise Point in Shelter Island Sound, NY in approx. 45’ of water. Mariners are urged to use caution will transiting the area.
General General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes | Marine Construction (Excluding Bridges) | General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes From: 2025-11-03 To: 2026- 10-31 Location: 40-42-06.984N/074-02-02.364W PKF-Mark III, Inc will be conducting marine construction operations on the Hudson River, at Liberty State Park, in position 40-42-7.000N, 074-02-02.370W, from November 3, 2025, to October 31, 2026, Monday through Friday from 6:00am to 5:00pm. Equipment on scene will be multiple floating barges, crane barges, and material barges. | Lat: 40° 42′ 25″ Lon: -074° 02′ 01″
Bridges Great Peconic Bay – Shinnecock Canal Entrance/General/Bridges/Lighting and Other Signals General/Bridges/Lighting and Other Signals From: 2025-10-01 To: 2026-08-02 Location: 40-53-24.180N/072-30-05.616W Bridge Name: Montauk Hwy Bridge Posillico Civil will be conducting navigational lighting replacement on the NY27 Sunrise Highway overpass, over Shinnecock Canal waterway, in position 40-53-24N, 072-30-05W, from November 1, 2025, to August 1, 2026. All work will happen with a Snooper truck on the roadway and may limit the vertical clearance of the bridge. The on-scene work party can be contacted on VHF-FM CH 13 and 16 for any concerned traffic and will require a 30-minute notice for any equipment movement requests.
Hazards To Navigation Great South Bay – Bellport Bay/General/Hazards To Navigation/Shoaling Reported General/Hazards To Navigation/Shoaling Reported From: 2026-03-06 To: 2027-03-06 Location: 40-44-09.096N/072-52- 27.444W Shoaling has been reported of 3.0 feet at mean low low water in the vicinity of position 40-44-9.115N, 072-52- 27.447W. Mariners are advised to transit the area with extreme caution.
Hazards To Navigation Great South Bay – North Side/General/Hazards To Navigation/Shoaling Reported General/Hazards To Navigation/Shoaling Reported From: 2024-09-13 To: 2039-11-12 NY-SAYVILLE-BROWNS CREEK Mariners be advised, dangerous shoaling conditions exist east of Browns Creek and vicinity which cause dangerous conditions when transiting the channel. Mariners should exercise extreme caution when navigating the channel.
Discrepancy Great South Bay Buoy 30 Aid status: off station (OFF STATION); Light List number: 29340; Aid type: Federal aid (FD)
Marine Construction (Excluding Bridges) Hudson River – Troy Dam/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes From: 2026-05- 11 To: 2026-11-30 Location: 42-42-03.996N/073-41-09.996W Carteret Marine Services will be conducting marine construction operations at the Troy Locks, Hudson River, in position 42-45-04N, 073-41-10W, from May 11, 2026, to November 30, 2026, between 7:00am to 5:00pm. Equipment on scene will be a barge and vessel, monitoring VHF-FM CH 8 & 16.
Discrepancy Hudson River Anchorage 16 CG Mooring Buoy Aid status: missing (MISSING); Light List number: 37666; Aid type: Federal aid (FD)
Discrepancy Hudson River Buoy 173 Aid status: missing (MISSING); Light List number: 38757; Aid type: Federal aid (FD)
Discrepancy Hudson River Lighted Buoy 119 Aid status: light extinguished (LT EXT); Light List number: 38495; Aid type: Federal aid (FD)
Discrepancy Hudson River Lighted Buoy 133 Aid status: off station (OFF STATION); Light List number: 38585; Aid type: Federal aid (FD)
Discrepancy Hudson River Lighted Buoy 16 Aid status: off station (OFF STATION); Light List number: 37770; Aid type: Federal aid (FD)
Discrepancy Hudson River Lighted Buoy 66 Aid status: off station (OFF STATION); Light List number: 38160; Aid type: Federal aid (FD)
Discrepancy Lake Montauk Lighted Buoy 13 Aid status: missing (MISSING); Light List number: 19975; Aid type: Private aid (PA)
Bridges Long Island Sound Eastern Part – Bridgeport Harbor/General/Bridges/Inspection General/Bridges/Inspection From: 2026-06-18 To: 2026-07-11 Location: 41-10-59.034N/073-11-09.298W Bridge Name: Peck Railroad Bridge CONNECTICUT- PEQUONNOCK RIVER– Bridge Inspections – From July 6, 2026 to July 10, 2026 between 8:00 a.m. to 4:00 p.m. a 21’ parker boat and dive team will be performing diving inspection at the Peck Bridge across Pequonnock River at mile 0.3, in Bridgeport, Connecticut. This bridge inspection will not affect the navigational channel. Mariners with any questions may contact the contractor via marine radio VHF-FM Ch 13/16 or call Clay Carlson (959) 988-3963. Mariners are advised to exercise caution and reduce wake when transiting the area.
Bridges Long Island Sound Eastern Part – Housatonic River/General/Bridges/Repairs, Painting, Or Fender Replacement General/Bridges/Repairs, Painting, Or Fender Replacement From: 2026-07-01 To: 2027-12-31 Location: 41-12-19.044N/073-06- 34.776W Bridge Name: Devon Railroad Bridge CONNECTICUT – HOUSATONIC RIVER – Bridge Repairs – Beginning July 20, 2026, Connecticut Department of Transportation will be performing interim repairs on the Devon Bridge across Housatonic River at mile 3.9. Contractor will be utilizing a barge in the navigational channel that will reduce the horizontal clearance to 41’-6” as well as installing a platform under the bridge outside of the navigational channel that will reduce the vertical clearance. Work is expected to be completed in December 2027. Mariners with any questions can contact the contractor via marine radio VHF-FM Ch 13/16 or call CTDOT Environmental Coordinator Brian Brinsmade at (203) 389-3173. Mariners are advised to exercise caution and reduce wake when transiting the area.
Marine Construction (Excluding Bridges) Long Island Sound Eastern Part – Housatonic River/General/Marine Construction (Excluding Bridges)/Dredging General/Marine Construction (Excluding Bridges)/Dredging From: 2025-03-07 To: 2026-06-30 2) 40’ x 60’ Dredge Plant Spud Barges and 6) 30’ x 40’ Material Barges and 2) 24’ push boats. Work area is the East and West Bay Tidal Flat at the former Stratford Army Engine Plant
MSIB Long Island Sound Eastern Part – New London Harbor/General/MSIB General/MSIB From: 2025-08-07 To: 2026-08-07 Location: 41.40063° N / 72.09797° W 41.38869° N / 72.09122° W 41.38819° N / 72.09266° W 41.39609° N / 72.09736° W 41.40042° N / 72.09918° W 41.40063° N / 72.09797° W The Thames River federal navigation channel in the vicinity of the U.S. Naval Submarine Base on the Thames River has been reconfigured and narrowed. The Thames River Middle Range no longer marks the channel centerline and now marks the eastern channel edge along the outer boundary of the Naval Base security zone. This area may be restricted by the Navy Base floating barrier.
Marine Events Long Island Sound Western Part – Fireworks General/Marine Events/Fireworks From: 2026-06-26 To: 2026-07-04 Location: LARCHMONT, NY – LARCHMONT HARBOR – LONG ISLAND SOUND – FIREWORKS SAFETY ZONE Details: Mariners are advised that a safety zone will be enforced for a barge-based fireworks display, scheduled to be held on Larchmont Harbor, July 3, 2026, from 9:00 p.m. until 10:30 p.m. The fireworks barge will be in approximate position 40°55’25.47″N 73°44’32.23″W (WGS84) and the Safety Zone encompasses all waters within a 400-foot radius from the barge. Vessels may not enter, remain in, or transit through the Safety Zone during the enforcement period unless authorized by the Coast Guard Captain of the Port. Other Federal, State and local agencies may assist these personnel in the enforcement of the Safety Zone.
Marine Events Long Island Sound Western Part – Fireworks General/Marine Events/Fireworks From: 2026-05-15 To: 2026-07-05 Mariners are advised that a safety zone will be enforced for a barge- based fireworks display, scheduled to be held on the Manhasset Bay, July 4, 2026, from 9:30 p.m. until 10:00 p.m. The fireworks barge will be in approximate position 40° 49’ 40.49” N, 73° 42’ 18.4” W (NAD 83) and the Safety Zone encompass all waters within a 300 yard radius from the shoreline. Vessels may not enter, remain in, or transit through the Safety Zone during the enforcement period unless authorized by the Coast Guard Captain of the Port. Other Federal, State and local agencies may assist these personnel in the enforcement of the Safety Zone.
General Long Island Sound Western Part – Little Bay/General/Bridges/Maintenance Long Island Sound Western Part – Little Bay/General/Bridges/Maintenance | Bridges | General/Bridges/Maintenance From: 2026-04-17 To: 2026-11-01 Location: 40-47-57.520N/073-47-36.920W Bridge Name: Throgs Neck Bridge NEW YORK – EAST RIVER – Barge Placement –Beginning April 21, 2026 through October 31, 2026, contractors will be performing bridge painting at the Throgs Neck Bridge across East River at mile point 15.8. To perform this work contractors will be utilizing a barge 110’x 32’. At no time will the bridge be in the navigational channel. Mariners with any questions can contact Project Manager Steven V. D’Orazio at (646) 235-7518 or via marine radio VHF-FM CH 13/16. Mariners are advised to exercise caution when transiting the area. | Lat: 40° 47′ 58″ Lon: -073° 47′ 37″
General Long Island Sound Western Part – Little Bay/General/Bridges/Maintenance Long Island Sound Western Part – Little Bay/General/Bridges/Maintenance | Bridges | From June 24, 2026, to July 1, 2026, maintenance will be conducted to the approach spans of the Throgs Neck Bridge across the East River, mile 13.8, using an Under Bridge Inspection Unit (snooper truck). Work hours are 10:00 p.m. to 5:00 a.m. This maintenance will not impede the navigation channel. Mariners requiring full vertical clearance can contact in-scene supervisors on VHF-FM channel 13/16 or by calling 718-913-1562. Mariners are advised to exercise caution when transiting this area. | Lat: 40° 47′ 58″ Lon: -073° 47′ 37″
Marine Construction (Excluding Bridges) Long Island Sound Western Part – Little Neck Bay Approach/General/Marine Construction (Excluding Bridges)/Dredging General/Marine Construction (Excluding Bridges)/Dredging From: 2026-05-28 To: 2026-07-01 Location: 40-48-36.972N/073-45- 54.972W Breakwater Marine LLC will conduct dredging operations in Hague Basin, located in Narrow Bay/Great South Bay, New York, at coordinates 40°48’37” N / 73°45’55” W. The project is scheduled from May 29 to July 1, 2026, operating daily from 6:00 AM to 6:00 PM. Equipment on site will include a 60′ x 155′ dredge, a 25′ x 14′ pushboat, ten 35′ x 200′ scows, and a 20′ x 8′ aluminum work skiff. Vessels can be contacted via radio frequencies 13 and 16. Navigation safety measures include a 60-minute window to move vessels if needed, with a maximum of six barges moored at any time, gates to allow vessel passage, and turbidity curtains for environmental protection. The site is adjacent to the U.S. Merchant Marine Academy and other local landmarks.
Hazards To Navigation Long Island Sound Western Part – Milton Harbor/General/Hazards To Navigation/Shoaling Reported General/Hazards To Navigation/Shoaling Reported From: 2024-09-13 To: 2039-12-22 Location: 40.95282° N / 73.69544° W 40.95061° N / 73.69569° W 40.94138° N / 73.69947° W 40.94138° N / 73.69994° W 40.95266° N / 73.69569° W 40.95282° N / 73.69544° W NY-LONG ISLAND SOUND –MILTON HARBOR Severe Shoaling has been reported in Milton Harbor. Mariners are advised to proceed with caution while transiting the area.
Bridges Long Island Sound Western Part – Oyster Bay/General/Bridges/Inspection General/Bridges/Inspection From: 2026-06-10 To: 2026-06-25 Location: 40-54-10.476N/073-32-54.996W Bridge Name: Bayville Hwy Bridge From June 22, 2026 to June 24, 2026, an under-bridge inspection unit (UBIU) and safety boat will be operating at the Bayville Highway Bridge (West Shore Rd) across Mill Neck Creek at mile 0.1, between Bayville and Mill Neck, NY. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or call Seth Medwick at 917-821-9130. Mariners are advised to exercise caution and reduce wake when transiting the area.
General Main Channel – Boat Parade Main Channel – East River Main Channel/General/Marine Events/Boat Parade | Marine Events | General/Marine Events/Boat Parade From: 2026-06-26 To: 2026-06-27 MANHATTAN, NY – UPPER BAY – EAST RIVER – HUDSON RIVER – PROMOTIONAL EVENT ON BARGE UNDER TOW Mariners are advised that a tug and barge promotional event is scheduled to take place on portions of the Upper Bay, East River, and Hudson River on June 26, 2026, between 8:00 a.m. and 10:00 p.m. This event will involve 3 vessels including a tug, barge and a support vessel. The barge will have 50-foot inflatables attached to its port and starboard sides and will include water features. It will be towed from Staten Island then along the coastline of Manhattan, NY between the Lincoln Tunnel on the Hudson River and Midtown Tunnel on the East River in a continuous transit for the duration of the event. Interested mariners may contact the Event Coordinator on marine band radio channel 14 VHF-FM or via telephone at 251-391-1525.
General Main Channel – East River Main Channel/General/Bridges/Closure (Scheduled Or Emergency) Main Channel – East River Main Channel/General/Bridges/Closure (Scheduled Or Emergency) | Bridges | General/Bridges/Closure (Scheduled Or Emergency) From: 2024-11-06 To: 2026-12-25 Location: 40.73905278° N / 73.94273056° W Bridge Name: Borden Ave Bridge NEW YORK – EAST RIVER NEWTOWN CREEK – DUTCH KILLS – Bridge Closure – The Borden Ave Bridge, mile 1.2, is closed due to vandalism. Vessels able to pass under the bridge in the closed position may do so. Mariners with questions may contact Keith Burrows at (212) 839-3741, NYCDOT Director of Bridge & Tunnel Operations. Mariners are advised to plan their transits accordingly. | Lat: 40° 44′ 21″ Lon: -073° 56′ 34″
General Main Channel – East River Main Channel/General/Bridges/Inspection Main Channel – East River Main Channel/General/Bridges/Inspection | Bridges | General/Bridges/Inspection From: 2026-05-11 To: 2026-07-04 Location: 40-42-21.852N/073-59-48.300W Bridge Name: Brooklyn Bridge From May 11, 2026 – July 3, 2026, Monday-Friday, with occasional Saturdays and Sundays, between 9:00 a.m. and 2:00 p.m., a biennial bridge inspection using a traveler will be conducted on the Brooklyn Bridge. Mariners requiring the traveler to move to provide full vertical clearance can contact VTS New York, or contact the contractor via marine radio VHF-FM Ch. 13/16 or by calling 917-821-9097. Mariners are advised to exercise caution when transiting the area. | Lat: 40° 42′ 22″ Lon: -073° 59′ 48″
General Main Channel – East River Main Channel/General/Bridges/Inspection Main Channel – East River Main Channel/General/Bridges/Inspection | Bridges | From May 1, 2026 – December 31, 2026, Monday-Friday, with occasional Saturdays and Sundays, between 8:00 a.m. and 4:00 p.m., a biennial bridge inspection using a traveler and rigging will be conducted on the Manhattan Bridge, mile 1.1 in the East River, New York City. The safety boat Kylie Anne (CT8893BM) will be on scene during inspection operations. Mariners requiring the traveler to move to provide full vertical clearance can contact VTS New York, or contact the contractor via marine radio VHF-FM Ch. 13/16 or by calling 631-891-9721. Mariners are advised to exercise caution when transiting the area. | Lat: 40° 42′ 26″ Lon: -073° 59′ 26″
General Main Channel – East River Main Channel/General/Bridges/Inspection Main Channel – East River Main Channel/General/Bridges/Inspection | Bridges | General/Bridges/Inspection From: 2026-06-08 To: 2026-07-09 Location: 40-43-39.112N/073-55-44.076W Bridge Name: Kosciusko Bridge From June 8, 2026 to July 8, 2026, between 9:00 a.m. and 3:00 p.m., an inspection of the Kosciuszko Bridge over Newtown Creek at mile 2.1 using an under-bridge inspection unit (UBIU). Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 917-930-5541. Mariners are advised to exercise caution when transiting the area. | Lat: 40° 43′ 39″ Lon: -073° 55′ 44″
General Main Channel – East River Main Channel/General/Bridges/Inspection Main Channel – East River Main Channel/General/Bridges/Inspection | Bridges | General/Bridges/Inspection From: 2026-06-15 To: 2026-12-01 Location: 40-46-55.480N/073-53-17.830W Bridge Name: Rikers Island Bridge From June 15, 2026, to November 30, 2026, between 8:00 a.m. and 4:00 p.m., Monday-Friday and Saturday/Sunday, a barge and rowboat will be operated under Rikers Island Bridge over East River at mile 10.7 to perform inspections. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 646-460-3880 or 863-326-3750. Safety vessel NY8360GY will be on scene during the inspection. The barge and rowboat will be moved out of the navigable channel after work hours or when not in use. Mariners are advised to exercise caution when transiting the area. | Lat: 40° 46′ 55″ Lon: -073° 53′ 18″
General Main Channel – East River Main Channel/General/Bridges/Inspection Main Channel – East River Main Channel/General/Bridges/Inspection | Bridges | General/Bridges/Inspection From: 2026-06-15 To: 2027-01-01 Location: 40-48-01.710N/073-55-41.420W Bridge Name: 125th St Bridge From June 15, 2026, to December 31, 2026, between 7:00 a.m. and 4:00 p.m., a barge with manlift will be operated under 125th St. (RFK) Bridge over Harlem River at mile 1.3 to perform inspections. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 347-489-2906. The barge with manlift will be moved out of the navigable channel after work hours or when not in use. Mariners are advised to exercise caution when transiting the area. | Lat: 40° 48′ 02″ Lon: -073° 55′ 41″
General Main Channel – East River Main Channel/General/Bridges/Inspection Main Channel – East River Main Channel/General/Bridges/Inspection | Bridges | General/Bridges/Inspection From: 2026-06-22 To: 2026-06-27 Location: 40-42-21.852N/073-59-48.300W Bridge Name: Brooklyn Bridge From June 22-26, 2026, between 8:30 a.m. and 2:00 p.m., a bridge traveler will be operated under the Brooklyn Bridge over East River at mile 0.8 to perform bridge inspection. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 917-295-1856 or 917-471-2257. The traveler platform will be moved out of the navigable channel after work hours or when not in use. Mariners are advised to exercise caution when transiting the area. | Lat: 40° 42′ 22″ Lon: -073° 59′ 48″
General Main Channel – East River Main Channel/General/Bridges/Inspection Main Channel – East River Main Channel/General/Bridges/Inspection | Bridges | General/Bridges/Inspection From: 2026-06-25 To: 2026-06-26 Location: 40-45-24.950N/073-57-16.550W Bridge Name: Queensboro Bridge On June 25, 2026, between 9:00 a.m. and 2:00 p.m., a bridge traveler will be operated under the Queensboro Bridge over East River at mile 5.5 to perform bridge inspection. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 917-295-1856 or 917-471-2257. The traveler platform will be moved out of the navigable channel after work hours or when not in use. Mariners are advised to exercise caution when transiting the area. | Lat: 40° 45′ 25″ Lon: -073° 57′ 17″
General Main Channel – East River Main Channel/General/Bridges/Inspection Main Channel – East River Main Channel/General/Bridges/Inspection | Bridges | General/Bridges/Inspection From: 2026-06-26 To: 2026-06-27 Location: 40-45-24.950N/073-57-16.550W Bridge Name: Queensboro Bridge On June 26, 2026, between 9:00 a.m. and 2:00 p.m., a bridge traveler will be operated under the Queensboro Bridge over East River at mile 5.5 to perform bridge inspection. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 917-295-1856 or 917-471-2257. The traveler platform will be moved out of the navigable channel after work hours or when not in use. Mariners are advised to exercise caution when transiting the area. | Lat: 40° 45′ 25″ Lon: -073° 57′ 17″
General Main Channel – East River Main Channel/General/Bridges/Inspection Main Channel – East River Main Channel/General/Bridges/Inspection | Bridges | General/Bridges/Inspection From: 2026-06-29 To: 2026-07-03 Location: 40-42-26.240N/073-59-26.350W Bridge Name: Manhattan Bridge From June 29-July 2, 2026, between 9:00 a.m. and 2:00 p.m., a bridge traveler will be operated under the Manhattan Bridge over East River at mile 1.1 to perform their biennial bridge inspection. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 917-295-1856 or 917-471-2257. The traveler platform will be moved out of the navigable channel after work hours or when not in use. Mariners are advised to exercise caution when transiting the area. | Lat: 40° 42′ 26″ Lon: -073° 59′ 26″
Bridges Main Channel – East River Main Channel/General/Bridges/Rehabilitation General/Bridges/Rehabilitation From: 2024-07-01 To: 2027-12-31 Location: 40.77988889° N / 73.92682778° W Bridge Name: Triboro Bridge Structural Rehabilitation –Construction at the RFK Bridge across East River at mile 7.8 will commence on July 1, 2024. Hours of operation are during daylight hours. A temporary platform will be installed under the entire length and width of suspended span. The platform will reduce the vertical clearance by 4 feet plus 2 feet sag allowance (6 feet total). There will hot work/welding during construction. Any questions regarding this project can contact Andre Markarian via marine radio VHF-FM Ch. 13/16 or 510-774-2198. This project is to be completed by December 31, 2027. Mariners are advised to exercise caution when transiting the area.
General Main Channel – East River Main Channel/General/Bridges/Rehabilitation Main Channel – East River Main Channel/General/Bridges/Rehabilitation | Bridges | From August 1, 2026, through October 9, 2026, between 6:00 a.m. and 2:30 p.m., underwater repairs to the Brooklyn pier and fender of the Brooklyn Bridge across the East River at mile 0.8 shall take place utilizing divers from a platform moored adjacent to the Brooklyn pier. Mariners can contact the contractor via marine radio VHF-FM Ch. 13/16 or call Tom McIntosh from JT Cleary at (201) 417-4115. Mariners are advised to transit at a slow bell and exercise caution through the area. | Lat: 40° 42′ 22″ Lon: -073° 59′ 48″
General Main Channel – East River Main Channel/General/Bridges/Rehabilitation Main Channel – East River Main Channel/General/Bridges/Rehabilitation | Bridges | Structural repairs to the Brooklyn Bridge, over the East River at mile 0.8, have commenced and will be ongoing through at least June 30, 2026, using the bridge traveler over the navigable channel. Active work will occur between 8:00 a.m. and 2:00 p.m., Monday through Friday. The traveler will reduce the vertical clearance of the bridge by 17 feet. During work hours the traveler can move with 2 hours’ notice for vessels requiring full vertical clearance. Mariners requiring full vertical clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call the VTS-NY watch supervisor at (718) 354-4088. The traveler platform will be moved out of the navigable channel each week from 2:00 p.m. on Friday until 8:00 a.m. on Monday. During the work week, the traveler may remain staged over the navigable channel outside of work hours. Mariners requiring full vertical clearance for transits between 2:00 p.m. and 8:00 a.m. on Monday through Thursday are strongly advised to contact the VTS-NY watch supervisor prior to 12:00 p.m. to arrange for the traveler to be located outside the navigable channel. Mariners with general questions about this construction project can contact NYC DOT at (917) 842-3753 or (212) 839-3740. Mariners are advised to exercise caution when transiting the area. | Lat: 40° 42′ 22″ Lon: -073° 59′ 48″
General Main Channel – East River Main Channel/General/Bridges/Repairs, Painting, Or Fender Replacement Main Channel – East River Main Channel/General/Bridges/Repairs, Painting, Or Fender Replacement | Bridges | Fender repairs are ongoing to the 145th Street Bridge across the Harlem River, mile 2.8, in New York City. From March 25, 2026 through June 26, 2026, barges will be staged 24/7 in the East Channel of the bridge opening, leaving 25 feet of vertical clearance. The West Channel of the bridge opening will not be obstructed. Active work on the fender system will occur 6:00 a.m. to 2:30 p.m. Monday through Friday. Mariners requiring additional information on this project may contact the project manager at (201) 417-4115. Mariners are advised to exercise caution when transiting the area. | Lat: 40° 49′ 10″ Lon: -073° 55′ 59″
General Main Channel – East River Main Channel/General/Bridges/Repairs, Painting, Or Fender Replacement Main Channel – East River Main Channel/General/Bridges/Repairs, Painting, Or Fender Replacement | Bridges | General/Bridges/Repairs, Painting, Or Fender Replacement From: 2026-06-22 To: 2026-07-18 Location: 40-49-41.140N/073- 56-01.680W Bridge Name: Macombs Dam Bridge From June 22, 2026, to July 17, 2026, between 6:00 a.m. and 2:30 p.m., two barges will be moored adjacent either to the north end or south end of the fender system of the Macombs Dam Bridge over Harlem River at mile 3.2 to perform fender repairs. Marine traffic will have access through the main channel. Slow speeds/no wake is requested during working hours. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch. 13/16 or call 917-440-9726. Mariners are advised to exercise caution when transiting the area. | Lat: 40° 49′ 41″ Lon: -073° 56′ 02″
General Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes | Marine Construction (Excluding Bridges) | General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes From: 2026-03-06 To: 2026-10-31 Location: 40-43-12.792N/073-55-32.268W Trevcon Construction Company, LLC. Will be Removing an Existing Seawall; Removal of Timber Decking and Piles; Dredging, Installation of Scour Protection, in Newton Creek, NY, in position 40-43-12.8N, 073-55-32.3W, between March 6, 2026, to October 30, 2026, between 5:00am, to 7:00pm. Equipment on scene will be Two Barge mounted cranes (180’ x 60’), Two Barges (140’ x 50’), One Barge (195’ x 35’). | Lat: 40° 43′ 13″ Lon: -073° 55′ 32″
General Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes | Marine Construction (Excluding Bridges) | General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes From: 2026-03-20 To: 2027-08-31 Location: 40-48-15.084N/073-55-49.980W Trevcon Construction Company will be conducting demolition and reconstruction operations on the Harlem River, west shoreline from RFK Bridge(125th St.) to Metro North Rail Bridge (132nd St.)in position 40-48-15.1N, 073-55-50W, through August 2027, Monday through Friday, between 5:00am to 6:00pm. Equipment on scene will be multiple crane barges, and material barges, monitoring VHF-FM CH 13, 16, 65, &75. Floating Equipment will be positioned along the West shoreline of the Harlem River, vessel traffic will not be impeded. | Lat: 40° 48′ 15″ Lon: -073° 55′ 50″
General Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes | Marine Construction (Excluding Bridges) | General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes From: 2026-03-23 To: 2028-11-04 Location: 40-42-34.272N/073-59-05.388W Reicon will be conducting pile repair and rehabilitation operations at Pier 36, East River, New York, NY, in position 40-42-34.3N, 073-59-05.4W, from February 23, 2026, to November 3, 2028, Monday through Friday, between 6:00am to 2:00pm, local time. Equipment on scene will be a dive barge, monitoring VHF- FM Ch 13 and is requesting mariners to minimize their wake, while operations are being conducted. | Lat: 40° 42′ 34″ Lon: -073° 59′ 05″
General Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes | Marine Construction (Excluding Bridges) | General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes From: 2026-07-20 To: 2026-12-31 Location: 40-42-20.880N/073-58-57.288W This Local Notice to Mariners (LNM) report, submitted to the U.S. Coast Guard First District, announces upcoming waterborne crane operations in support of building construction on the East River, New York. The project, managed by Grace Industries LLC, will take place at coordinates 40° 42.348’N, 073° 58.955’W, from July 20, 2026, through December 31, 2026. Operations are scheduled Monday through Saturday, 6:00 AM to 6:00 PM, with cranes and material barges present at the site. Mariners in the area are advised to use slow speed (“slowbell”) near the crane operations and may contact the operation via marine radio channels 16, 13, and 61A for coordination. | Lat: 40° 42′ 21″ Lon: -073° 58′ 57″
General Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes | Marine Construction (Excluding Bridges) | General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes From: 2024-05-01 To: 2026-06-30 Location: 40.80937° N / 73.9343° W 40.80628° N / 73.93212° W 40.80336° N / 73.92984° W 40.80213° N / 73.92903° W 40.80203° N / 73.92928° W 40.80336° N / 73.93006° W 40.80625° N / 73.93237° W 40.80752° N / 73.93345° W 40.80862° N / 73.93409° W 40.80937° N / 73.9343° W
General Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes | Marine Construction (Excluding Bridges) | General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes From: 2025-09-01 To: 2027-07-05 Location: 40.7427° N / 73.97198° W 40.74265° N / 73.97148° W 40.73988° N / 73.97216° W 40.73999° N / 73.97258° W 40.7427° N / 73.97198° W Phoenix Marine Co. will be conducting diver\ operations in the East River at the Marginal Wharf Platforms at The Water Club and E. 34th St. Heliport, in position 40*44’36”N-73*58’16” W through 40*44’22”N-73*58’20”W. Work will be conducted between 6:00am-2:00pm, from September 15, 2025 to July 5, 2027. Equipment on scene will be (1) crane barge, (1) material barge and (1) work platform barge monitoring VHF-CH 9. Mariners transiting the work area are urged to exercise extreme caution, travel at the slowest safe speed to minimize wake, and proceed with caution
General Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes | Marine Construction (Excluding Bridges) | General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes From: 2026-05-26 To: 2026-09-30 This Local Notice to Mariners (LNM) Information Form, submitted to the U.S. Coast Guard District Northeast, details a marine construction project by C.A.C. Industries, managed by Michal Mludzik. The project involves timber pile repair, dive work, and concrete infill under the esplanade at Bobby Wagner Walk, New York, NY (just north of the E 90th Street ferry and south of DSNY 91st Street MTS), with precise coordinates at 40°46’41.2″N, 73°56’33.4″W. Operations are scheduled to begin May 27, 2026, and continue through September 2028, taking place Monday through Friday from 0600 to 1600 hours, dependent on tidal conditions. The site will utilize a 120×55 deck barge equipped with an MLC-150 crane, and marine radio communications will be available via channel 16 (hail) and channel 78 (monitor). The barge will be stationed along the bulkhead to minimize navigation impact.
General Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Survey Operations Main Channel – East River Main Channel/General/Marine Construction (Excluding Bridges)/Survey Operations | Marine Construction (Excluding Bridges) | General/Marine Construction (Excluding Bridges)/Survey Operations From: 2026-06-30 To: 2026-07-15 Location: 40-46- 55.740N/073-56-36.744W Polina Ustinova of Entech Engineering submitted a Local Notice to Mariners (LNM) Information Form regarding underwater reality capture work for the condition assessment of submerged piles along the East River Esplanade between 90th and 99th streets. The project will utilize a tethered ROV equipped with a camera and navigation sonar, operating from the shore at coordinates 40°46’56.3″N, 73°56’37.7″W. Work is scheduled for June 30 to July 3, 2026, and July 8 to July 15, 2026, with daily operations from 7AM to 3PM, Monday through Friday. The ROV will remain close to the shore, away from vessel traffic, and the operator will maintain situational awareness and yield to any incoming traffic as needed. No radio frequency will be used for vessel contact. | Lat: 40° 46′ 56″ Lon: -073° 56′ 37″
General Main Channel – Fireworks Main Channel – East River Main Channel/General/Marine Events/Fireworks | Marine Events | General/Marine Events/Fireworks From: 2026-06-18 To: 2026-06-26 Mariners are advised that a safety zone will be enforced for a barge-based fireworks display, scheduled to be held on the East River, June 25, 2026, from 8:00 p.m. until 10:00 p.m. The fireworks barge will be in approximate position 40° 42’ 10.30”N, 074° 0’ 1.25”W (NAD 83) and the Safety Zone encompass all waters within a 500-foot radius from the barge. Vessels may not enter, remain in, or transit through the Safety Zone during the enforcement period unless authorized by the Coast Guard Captain of the Port. Other Federal, State and local agencies may assist these personnel in the enforcement of the Safety Zone.
General Main Channel – Fireworks Main Channel – Hudson River/General/Marine Events/Fireworks | Marine Events | General/Marine Events/Fireworks From: 2026-06-18 To: 2026-06-26 Mariners are advised that a safety zone will be enforced for a barge-based fireworks display, scheduled to be held on the Hudson River in the vicinity of Chelsea Pier 61, on June 25, 2026, from 8:00 p.m. until 10:00 p.m. The fireworks barge will be in approximate position 40°44’52” N, 074°00’53” W (NAD 83) and the Safety Zone encompass all waters within a 1000 foot radius from the barge. Vessels may not enter, remain in, or transit through the Safety Zone during the enforcement period unless authorized by the Coast Guard Captain of the Port. Other Federal, State and local agencies may assist these personnel in the enforcement of the Safety Zone.
General Main Channel – Fireworks Main Channel – Hudson River/General/Marine Events/Fireworks | Marine Events | General/Marine Events/Fireworks From: 2026-06-24 To: 2026-07-05 Mariners are advised that a safety zone will be enforced for a barge-based fireworks display, scheduled to be held on the Hudson River, July 4, 2026, from 9:00 p.m. until 10:00 p.m. The fireworks barge will be in approximate position 41° 42’ 24.50” N, 73° 56’ 44.16” W (NAD 83) and the Safety Zone encompass all waters within a 720 foot radius from the barge. Vessels may not enter, remain in, or transit through the Safety Zone during the enforcement period unless authorized by the Coast Guard Captain of the Port. Other Federal, State and local agencies may assist these personnel in the enforcement of the Safety Zone. Location: 41-42-34.848N/073-56-54.024W 41-42-34.488N/073-56-53.556W 41-42-32.976N/073-56- 29.760W 41-42-13.248N/073-56-33.000W 41-42-15.804N/073-56-56.472W 41-42-34.848N/073-56-54.024W
General Main Channel – Hudson River/General/Bridges/Closure (Scheduled Or Emergency) Main Channel – Hudson River/General/Bridges/Closure (Scheduled Or Emergency) | Bridges | In order to facilitate the transportation of spectators attending regional FIFA World Cup matches, the Spuyten Duyvil Bridge, mile 7.9 across the Harlem River NY, will not open for marine traffic during the following time periods: From 2:00 p.m. Saturday, June 13, 2026, to 6:00 p.m. Saturday, June 13, 2026. From 8:00 p.m. Saturday, June 13, 2026, to 12:00 a.m. Sunday, June 14, 2026. From 3:00 p.m. Sunday, June 14, 2026, to 7:00 p.m. Sunday, June 14, 2026. From 9:00 p.m. Sunday June 14, 2026, to 1:00 a.m. Monday, June 15, 2026. From 11:00 a.m. Tuesday, June 16, 2026, to 3:00 p.m. Tuesday June 16, 2026. From 5:00 p.m. Tuesday, June 16, 2026, to 9:00 p.m. Tuesday, June 16, 2026. From 5:00 p.m. Friday, June 19, 2026, to 9:00 p.m. Friday, June 19, 2026. From 11:00 p.m. Friday, June 19, 2026, to 3:00 a.m. Saturday, June 20, 2026. From 1:00 p.m. Monday, June 22, 2026, to 8:00 p.m. Monday, June 22, 2026. From 10:00 p.m. Monday, June 22, 2026, to 2:00 a.m. Tuesday, June 23, 2026. From 12:00 p.m. Thursday, June 25, 2026, to 4:00 p.m. Thursday, June 25, 2026. From 6:00 p.m. Thursday, June 25, 2026, to 10:00 p.m. Thursday, June 25, 2026. From 1:00 p.m. Saturday, June 27, 2026, to 5:00 p.m. Saturday, June 27, 2026. From 7:00 p.m. Saturday, June 27, 2026, to 11:00 p.m. Saturday, June 27, 2026. From 1:00 p.m. Tuesday, June 30, 2026, to 5:00 p.m. Tuesday June 30, 2026. From 7:00 p.m. Tuesday June 30, 2026, to 11:00 p.m. Tuesday, June 30, 2026. From 1:00 p.m. Saturday, July 4, 2026, to 5:00 p.m. Saturday, July 4, 2026. From 7:00 p.m. Saturday July 4, 2026, to 11:00 p.m. Saturday, July 4, 2026. From 12:00 p.m. Sunday, July 5, 2026, to 4:00 p.m. Sunday, July 5, 2026. From 6:00 p.m. Sunday, July 5, 2026, to 10:00 p.m. Sunday, July 5, 2026. From 11:00 a.m. Sunday, July 19, 2026, to 3:00 p.m. Sunday, July 19, 2026. From 5:00 p.m. Sunday, July 19, 2026, to 9:00 p.m. Sunday, July 19, 2026. Vessels able to transit under the bridge in the closed position may continue to do so. Mariners are advised to exercise caution when transiting the area. | Lat: 40° 52′ 42″ Lon: -073° 55′ 32″
Bridges Main Channel – Hudson River/General/Bridges/Construction General/Bridges From: 2025-08-18 To: 2029-02-29 Location: 42.65434° N / 73.74177° W Bridge Name: Livingston Avenue Railroad Bridge Bridge Replacement – Construction and demolition of existing railroad structures and facilities of the Livingston Avenue Railroad Bridge over the Hudson River at mile 146.2 between Albany and Rensselaer commenced on 18 August 2025. Work hours are Monday through Saturday between 6a.m. and 6 p.m. through September 30, 2026. There will be a safety boat operating IVO the bridge. For construction details please contact Jack Phillips at 347 924-5635 or via marine radio VHF-FM 13/16. Mariners are advised to exercise caution when transiting the area.
Bridges Main Channel – Hudson River/General/Bridges/Rehabilitation General/Bridges/Rehabilitation From: 2024-09-03 To: 2027-06-30 Location: 42-30-33.840N/073-46-23.340W Bridge Name: Castleton Highway Bridge Bridge Rehabilitation – Construction to the Castleton Highway Bridge across Hudson River at mile 135.7 is extended from June 30, 2026 to June 30, 2027. Hours of operation are from 7 a.m. and 7 p.m. Temporary safe span platforms will be installed under the tram rail steel (over navigation channel) which will reduce vertical clearance by approximately 6 feet. A minimum of 210 feet east side and the west side of the navigation channel will be cleared of obstruction at all times for safe passage of vessels. In addition, 25 feet of buffer will be maintained on each side of the channel marker. A safety boat will be operated IVO the bridge. Hot work will be performed during construction. Mariners requiring full horizontal clearance can contact the contractor/operator via marine radio VHF-FM CH 13 or call 518-857-9215. For all construction related questions, please contact Tim Mastro at 518-337-7231. This project is to be completed by June 30, 2027. Mariners are advised to exercise caution when transiting the area.
Bridges Main Channel – Hudson River/General/Bridges/Rehabilitation General/Bridges/Rehabilitation From: 2024-05-01 To: 2029-12-31 Location: 40.851559° N / 73.9522° W Bridge Name: George Washington Bridge Rehabilitation of Lower Level Structural Steel, Painting and Replacement of Maintenance Travelers – Construction to the rehabilitation at the George Washington Bridge across the Hudson River at mile 11.0 will commence on May 1, 2024. Temporary work platform will be installed under the entire length of the bridge. The temporary work platform will reduce the vertical clearance by 3ft 9in plus 2ft sag max. below the low steel. Welding (hot work) may be performed during working hours. A 26 ft safety boat will be operating in the vicinity of the bridge. Mariners requiring full horizontal clearance can contact Michael Androsiglio 914- 447-7513 or via marine radio. The resident engineer or contractor will be equipped with a VHF-FM marine radio and will be monitoring Channel 13/16 during hours of operation. Mariners can contact Marc Helman at 212-435-6112 or 551-220-8853 or Henry Chiang at 201-346-8921 for construction details. This project is to be completed by December 31, 2029. Mariners are advised to exercise extreme caution when transiting the area.
General Main Channel – Hudson River/General/Hazards To Navigation/Shoaling Reported Main Channel – Hudson River/General/Hazards To Navigation/Shoaling Reported | Hazards To Navigation | General/Hazards To Navigation/Shoaling Reported From: 2024-09-12 To: 2039-12-01 Location: 42.07223° N / 73.92927° W 42.07103° N / 73.92916° W 42.07132° N / 73.93048° W 42.07204° N / 73.92998° W 42.07223° N / 73.92927° W NY-HUDSON RIVER-CATSKILL CREEK-ESOPUS CREEK-ROUNDOUT CREEK Significant shoaling has been reported at the mouth of Catskill Creek, that may impact commercial traffic, along the southern portion of the channel. In Esopus Creek, shoaling has occurred faster than anticipated at the mouth of the creek when passing between Saugerties Lighthouse and Hudson River Lighted Buoy 93. In Roundout Creek, there is shoaling at the mouth of the creek. Mariners should exercise caution when navigating these areas.
General Main Channel – Hudson River/General/LAA/RNA/Safety Zone Main Channel – Hudson River/General/LAA/RNA/Safety Zone | LAA/RNA | General/LAA/RNA/Safety Zone § 165.T01-0336 Safety Zone; Hudson River, Manhattan, NY (a) Location. The following area is a safety zone: All waters of the Hudson River from surface to bottom, encompassed by a line connecting the following points beginning at 40°45′20.32″ N, 074°00′23.84″ W; thence to 40°45′23.34″ N, 074°00′30.60″ W; thence to 40°45′24.03″ N, 074°00′40.85″ W; thence to 40°45′18.89″ N, 074°00′48.18″ W; thence to 40°45′13.80″ N, 074°00′48.64″ W; thence to 40°45′08.03″ N, 074°00′46.44″ W; thence to 40°45′07.51″ N, 074°00′37.61″W; thence to 40°45′09.18″ N, 074°00′36.37″ W; thence to 40°45′06.70″ N, 074°00′30.78″W; thence returning along the Manhattan shoreline to the beginning point. These coordinates are based on the World Geodetic System (WGS 84) / North American Datum 83 (NAD 83). (b) Definitions. As used in this section, designated representative means a Coast Guard Patrol Commander, including a Coast Guard coxswain, petty officer, or other officer operating a Coast Guard vessel and a Federal, State, and local officer with law enforcement authority designated by or assisting the Captain of the Port New York (COTP) in the enforcement of the safety zone. (c) Regulations. (1) Under the general safety zone regulations in subpart C of this part, you may not enter the safety zone described in paragraph (a) of this section unless authorized by the COTP or the COTP’s designated representative. (2) To seek permission to enter, contact the COTP or the COTP’s representative on VHF-FM channel 16 or by telephone at (718) 354-4353. Those in the safety zone must comply with all lawful orders or directions given to them by the COTP or the COTP’s designated representative. (3) Hudson River Community Sailing Vessels and Human Powered Vessels transiting directly to or from the Pier 66 area may transit through the southern area of the safety zone to the east of the Hudson River Cofferdam Lighted Hazard Buoy D (LLNR 37663.3) unless otherwise directed by the COTP or the COTPs designated representative. (d) Enforcement period. This section will be subject to enforcement from 12:01 a.m. on May 1, 2026, to 11:59 p.m. on January 20, 2029. If the project is completed before January 20, 2029, enforcement of the safety zone will be suspended, and notice given via Local Notice to Mariners. The Coast Guard Northeast District Local Notice to Mariners can be found at: https://www.navcen.uscg.gov/maritime-safety- information.
General Main Channel – Hudson River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes Main Channel – Hudson River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes | Marine Construction (Excluding Bridges) | General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes From: 2025-06-16 To: 2027- 06-25 Location: 40.77075° N / 73.99841° W Reicon Group, LLC will be conducting pile repairs at Pier 94 from June 16, 2025, to June 25, 2027, Monday through Friday, between 7:00am to 3:30pm. Equipment on scene will be the RTC 330, monitoring VHF-FM CH 13 and will require a 24-hour notice for all vessel movement requests. | Lat: 40° 46′ 15″ Lon: -073° 59′ 54″
General Main Channel – Hudson River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes Main Channel – Hudson River/General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes | Marine Construction (Excluding Bridges) | General/Marine Construction (Excluding Bridges)/Facilities, Barriers, Manmade Reefs, Riprap, Jetties/Dikes From: 2026-02-17 To: 2031- 01-29 Location: 41-59-01.284N/073-57-06.408W Bank Stabilization operations will be conducted north of the Kingston Rhinecliff Bridge off the west side of the Hudson River in position 41-59-1.240N, 073-57-9.794W, from February 17, 2026, to January 28, 2031. Work will be conducted withing the Town of Ulster allowable work hours between 7:00 am to 10:00 pm. Equipment on scene will be, Long reach excavators from upland at first and possibly on a barge if necessary. All work will be within the existing cove. The work will be within the existing cove off the Hudson River and will not interfere with the channel. The installation of a 44-foot by 8-foot floating pier, attached to a bulkhead by a 36-foot by 4-foot gangway. Three (3) finger piers, approximately 36-feet by 6-feet each, will extend from the main floating pier. The entire pier assembly will be held in place by five (5) plastic, 16-inch-diameter piles, each installed by vibratory hammer. The dredging of a total of approximately 1,429 cubic yards of material, over an area of approximately 12,500 square feet. All dredged material will be disposed of within a contained upland disposal area on the property. | Lat: 41° 59′ 01″ Lon: -073° 57′ 06″
General Main Channel – Hudson River/General/Miscellaneous Main Channel – Hudson River/General/Miscellaneous | Miscellaneous | General/Miscellaneous From: 2026-06-08 To: 2026-08-07 Notice of proposed rulemaking – Anchorages; Port of New York The Coast Guard is proposing to amend regulations to conform to requirements in the National Defense Authorization Act for Fiscal Year 2026, which required the Commandant to prohibit any vessel anchoring on the reach of the Hudson River between Yonkers, New York and Kingston, New York. We invite your comments on this proposed rulemaking. The complete rulemaking is attached and is available at https://www.govinfo.gov/content/pkg/FR-2026-06-08/pdf/2026-11434.pdf We view public participation as essential to effective rulemaking and will consider all comments and material received during the comment period. Your comment can help shape the outcome of this rulemaking. Submitting comments. We encourage you to submit comments at https://www.regulations.gov. To do so, go to https://www.regulations.gov, type “USCG–2026–0042” in the search box and click ‘‘Search.’’ Next, look for this document in the Search Results column, and click on it. Then click on the “Comment” option. You may also access the complete docket directly at https://www.regulations.gov/document/USCG-2026-0042-0001. Comments and related material must be received by the Coast Guard on or before August 7, 2026. For questions regarding this rulemaking contact Mr. Craig Lapiejko, Waterways Management at Coast Guard Northeast District, telephone (571) 607-6314, e-mail [email protected].
General Main Channel – Swim Main Channel – Hudson River/General/Marine Events/Swim | Marine Events | LNM NY – EAST RIVER – HARLEM RIVER – HUDSON RIVER – Swim Mariners are advised that multiple swim events are scheduled from June 13, 2026, through October 13, 2026, navigating counterclockwise around Manhattan, NY. Approximately two to five participating swimmers will be assisted by a lead safety vessel in addition to one escort vessel and one escort kayak per every one to two swimmers. The swim events will start at either Pier A in Battery Park or Mill Rock, near East 90th St., Manhattan. They will proceed up the East River, through the Harlem River, and down the Hudson River, concluding back at the start position. Interested mariners may contact the Principal Swim Safety Officer on VHF channel 6. See list of dates and times below: Date Start Time Finish Time Start Location A. 06/13/2026 6:36 PM 3:06 AM Pier A B. 06/15/2026 2:00 AM 8:00 AM Mill Rock C. 06/16/2026 8:56 AM 5:26 PM Pier A D. 06/17/2026 9:51 AM 6:21 PM Pier A E. 07/11/2026 5:23 PM 1:53 AM Pier A F. 07/12/2026 6:21 PM 2:51 AM Pier A G. 07/14/2026 7:52 AM 4:22 PM Pier A H. 07/15/2026 8:45 AM 5:15 PM Pier A I. 07/16/2026 9:38 AM 6:08 PM Pier A J. 07/17/2026 10:32 AM 7:02 PM Pier A K. 08/01/2026 9:53 AM 6:23 PM Pier A L. 08/02/2026 10:37 AM 7:07 PM Pier A M. 08/05/2026 1:01 PM 9:31 PM Pier A N. 08/06/2026 1:55 PM 10:25 PM Pier A O. 08/07/2026 2:56 PM 11:26 PM Pier A P. 08/08/2026 4:02 PM 12:32 AM Pier A Q. 08/11/2026 6:46 AM 3:16 PM Pier A R. 08/12/2026 7:40 AM 4:10 PM Pier A S. 08/13/2026 8:31 AM 5:01 PM Pier A T. 08/14/2026 9:22 AM 5:52 PM Pier A U. 08/15/2026 10:13 AM 6:43 PM Pier A V. 08/16/2026 11:04 AM 7:34 PM Pier A W. 08/28/2026 8:02 AM 4:32 PM Pier A X. 08/29/2026 8:42 AM 5:12 PM Pier A Y. 08/30/2026 9:23 AM 5:53 PM Pier A Z. 08/31/2026 10:07 AM 6:37 PM Pier A AA. 09/01/2026 10:53 AM 7:23 PM Pier A BB. 09/02/2026 11:42 AM 8:12 PM Pier A CC. 09/09/2026 6:32 AM 3:02 PM Pier A DD. 09/13/2026 9:51 AM 6:21 PM Pier A EE. 09/14/2026 10:40 AM 7:10 PM Pier A FF. 09/15/2026 11:30 AM 8:00 PM Pier A GG. 09/25/2026 6:50 AM 3:20 PM Pier A HH. 09/26/2026 7:31 AM 4:01 PM Pier A II. 09/28/2026 8:55 AM 5:25 PM Pier A JJ. 09/29/2026 9:40 AM 6:10 PM Pier A KK. 09/30/2026 10:27 AM 6:57 PM Pier A LL. 10/01/2026 11:19 AM 7:49 PM Pier A MM. 10/08/2026 6:14 AM 2:44 PM Pier A NN. 10/09/2026 7:05 AM 3:35 PM Pier A OO. 10/10/2026 7:54 AM 4:24 PM Pier A PP. 10/11/2026 8:41 AM 5:11 PM Pier A QQ. 10/12/2026 9:27 AM 5:57 PM Pier A RR. 10/13/2026 10:14 AM 6:44 PM Pier A
LAA/RNA New Rochelle Harbor North Approach – Middle Channel/General/LAA/RNA/COTP Restriction General/LAA/RNA/COTP Restriction From: 2024-12-16 To: 2027-05-31 The Coast Guard is establishing a temporary safety zone for certain waters of Long Island Sound in the vicinity of the Glen Island Approach Bridge, New Rochelle, NY, for construction vessels and machinery involved in the rehabilitation project of the bridge. The safety zone is needed to protect personnel, vessels, and the marine environment from potential hazards associated with the bridge construction between December 2, 2024, through May 27, 2027. When enforced, this regulation prohibits persons and vessels from being in the safety zone unless authorized by the Captain of the Port New York or a designated representative. DATES: This rule is effective without notice from December 3, 2024, through 5 p.m. on May 27, 2027. For the purposes of enforcement, actual notice will be used from midnight on December 2, 2024, until December 3, 2024. This rule will only be enforced during periods when construction operations at the bridge are in progress. Comments and related material must be received by the Coast Guard on or before March 3, 2025. ADDRESSES: To view documents mentioned in this preamble as being available in the docket, go to https://www.regulations.gov, type USCG-2024-0956 in the search box and click “Search.” Next, in the Document Type column, select “Supporting & Related Material.” FOR FURTHER INFORMATION CONTACT: If you have questions about this rule, call or email Jeffrey Yunker, Waterways Management Division, U.S. Coast Guard Sector New York; telephone 718-354-4195, email [email protected]. IV. Discussion of the Rule This rule establishes a safety zone from 7 a.m. until 5 p.m. each day starting on midnight December 2, 2024, through May 27, 2027. The safety zone will only be enforced during periods when construction operations at the Glen Island Bridge rehabilitation project are in progress. The anticipated dates for the windows of full channel closures are from 7 a.m. on December 2, 2024, through 5 p.m. on December 20, 2024; from 7 a.m. on February 3, 2025, through 5 p.m. on May 22, 2025; and from 7 a.m. on October 2, 2025, through 5 p.m. on April 29, 2026. The Coast Guard will make notice of the safety zone via the Local Notice to Mariners and issue a Broadcast Notice to Mariners via marine channel 16 (VHF-FM) as soon as practicable in advance of these scheduled closures. All these dates are tentative and subject to change due to weather, supply chain delays, or other unforeseen circumstances. This rule remains effective through May 27, 2027, in case the project is delayed due to unforeseen circumstances. The area regulated by the safety zone will encompass the waters around the Glen Island Bridge and will cover all navigable waters, from surface to bottom, within the area formed by connecting the following latitude and longitude points in the following order: 40°53′18.58″ N 73°46′56.26″ W; thence to 40°53′22.08″ N 73°46′59.39″ W; thence north along the shore to 40°53′23.8″ N 73°46′57.51″ W; thence to 40°53′19.15″ N 73°46′52.54″ W and thence south along the shore back to the point of origin. This area is intended for the vessels and machinery being used by personnel for the Glen Island Bridge rehabilitation project. The duration of the zone is intended to ensure the safety of personnel, vessels, and these navigable waters during the bridge construction. No vessel or person will be permitted to enter the safety zone without obtaining permission from the COTP or a designated representative. The Coast Guard will make notice of the safety zone via the Local Notice to Mariners and issue a Broadcast Notice to Mariners via marine channel 16 (VHF-FM) as soon as practicable in response to an emergency or hazardous condition.
LAA/RNA New Rochelle Harbor North Approach – Middle Channel/General/LAA/RNA/Temporary Regulated Navigation Zone New Rochelle, NY – Long Island Sound – Safety Zone – Bridge Construction Mariners are advised that a safety zone will be enforced for construction work on the Glen Island Approach Bridge. The safety zone will be enforced from 7 a.m. until 5 p.m. each day starting on midnight December 2, 2024, through May 27, 2027. The safety zone will only be enforced during periods when construction operations at the Glen Island Bridge rehabilitation project are in progress. The Safety Zone encompasses all waters within a line beginning at 40° 53′ 18.58″N 73° 46′ 56.26″W; thence to 40° 53′ 22.08″N 73° 46′ 59.39″W; thence north along the shore to 40° 53′ 23.8″N 73°46′ 57.51″W; thence to 40° 53′ 19.15″N 73° 46′ 52.54″W and thence south along the shore back to the point of origin (WGS 84). You may not enter, remain in, or transit through the Safety Zone during the enforcement period unless authorized by the Coast Guard Captain of the Port. Other Federal, State and local agencies may assist these personnel in the enforcement of the Safety Zone. Mariners are urged to exercise caution while in the area. The anticipated dates for the windows of full channel closures: Date December 2, 2024, through December 20, 2024 February 3, 2025, through May 22, 2025 October 2, 2025 through 12 p.m. on May 22, 2026; from 7 a.m. on May 26, 2026, through 5 p.m. on May 29, 2026; and from 7 a.m. on June 22, 2026, through 5 p.m. on June 26, 2026.
Hazards To Navigation North Channel – The Raunt Channel/General/Hazards To Navigation/Shoaling Reported General/Hazards To Navigation/Shoaling Reported From: 2024-09-13 To: 2039-10-20 Location: 40.60215° N / 73.83815° W 40.60189° N / 73.8372° W 40.60065° N / 73.83424° W 40.59977° N / 73.83497° W 40.60104° N / 73.83772° W 40.60147° N / 73.8387° W 40.60215° N / 73.83815° W NY-RAUNT CHANNEL (Booklet Chart 12350 JAMAICA BAY Recent surveys have shown significant shoaling in the Raunt Channel. Shoaling exists in the vicinity of Buoy 6, in approximate position 40-36.17N 073-50.47W. Depths of less than 5 feet in the middle of the channel. Navigation of the area requires extreme caution due to the encroaching nature of the shoal.
Discrepancy Shelter Island Sound North Channel Buoy 15 Aid status: missing (MISSING); Light List number: 28190; Aid type: Federal aid (FD)
Discrepancy Shelter Island Sound North Channel Lighted Buoy 11 Aid status: off station (OFF STATION); Light List number: 28135; Aid type: Federal aid (FD)
Discrepancy Shelter Island Sound North Channel Lighted Buoy 7 Aid status: off station (OFF STATION); Light List number: 28040; Aid type: Federal aid (FD)
Hazards To Navigation Shelter Island Sound South Channel – Little Peconic Bay/General/Hazards To Navigation/Shoaling Reported General/Hazards To Navigation/Shoaling Reported From: 2024-09-13 To: 2039-12-28 NY-LONG ISLAND SOUND (Eastern Part) (Chart 12354)-SOUTH SIDE-MATTITUCK INLET Shoaling has been reported in the Mattituck Inlet. Mariners are advised to proceed with caution while transiting the area.
Bridges Shelter Island Sound South Channel – Sag Harbor/General/Bridges/Inspection General/Bridges/Inspection From: 2026-05-19 To: 2026-06-27 Location: 41-00-12.500N/072-17-54.000W Bridge Name: Rt 114 Bridge NEW YORK – SAG HARBOR – Diving Inspections – From June 22, 2026 to June 26, 2026, between 8 a.m. and 4 p.m., a 21- foot boat and diving equipment at the Route 114 Bridge across Sag Harbor at mile 0. Mariners requiring full horizontal clearance can contact the contractor via marine radio VHF-FM Ch 13/16 or call Clay Carlson (959) 988-3963. Mariners are advised to exercise caution and reduce wake when transiting the area.
Discrepancy Shelter Island Sound South Channel Buoy 12 Aid status: missing / trub (MISSING/TRUB); Light List number: 28395; Aid type: Federal aid (FD)
Discrepancy Shelter Island Sound South Channel Buoy 12 Aid status: light extinguished (LT EXT); Light List number: 28395; Aid type: Federal aid (FD)
Discrepancy Shelter Island Sound South Channel Lighted Buoy 11 Aid status: missing / temporary replacement lighted buoy (MISSING/TRLB); Light List number: 28315; Aid type: Federal aid (FD)
Discrepancy Shelter Island Sound South Channel Lighted Buoy 15 Aid status: off station (OFF STATION); Light List number: 28405; Aid type: Federal aid (FD)